Dead Hang
Measure foundational grip endurance.
Target · 90 secondsCurrent evidence · Best observed: 62 seconds during the Aug 4 modified grip circuit; formal 90-second test pending
Benchmarks
Benchmarks connect objective evidence to projects and phases. A future-phase benchmark can be completed early, and its readiness contribution will remain attached to that phase.
Mission One
Ten-month adaptive progression
Session evidence is recorded separately from formal benchmark measurement and target achievement.
Measure foundational grip endurance.
Target · 90 secondsCurrent evidence · Best observed: 62 seconds during the Aug 4 modified grip circuit; formal 90-second test pending
Measure relative pulling strength and control.
Target · 10 strict repetitionsEstablish an aerobic performance baseline.
Target · Baseline and target pending verified assessmentTrack aerobic adaptation and recovery trends.
Target · Trend target pending sufficient dataTrack body-mass progression alongside performance and recovery without publishing private measurements.
Target · A performance-supporting trend without compromising recovery or enduranceMeasure sustained grip performance under mission-relevant fatigue.
Target · Protocol and target pending verified assessmentCurrent evidence · Aug 4 modified circuit: Dead Hang 48 / 55 / 62 sec · Farmer March 26 kg/hand × 40 / 40 / 48 yd · Plate Pinch 48/48 · 46/46 · 22/28 sec per hand. Formal protocol pending
Earlier-phase results will determine the most useful readiness measures and targets for this phase.
Earlier-phase results will determine the most useful readiness measures and targets for this phase.
Earlier-phase results will determine the most useful readiness measures and targets for this phase.
Earlier-phase results will determine the most useful readiness measures and targets for this phase.